翻訳と辞書 |
Solar power in Idaho : ウィキペディア英語版 | Solar power in Idaho
Solar power in Idaho on rooftops can provide 23% of all electricity used in Idaho.〔(Report Argues for a Decentralized System of Renewable Power Generation )〕 The low average cost of electricity makes Idaho one of the last states in the country to reach grid parity.〔(Reaching Grid Parity )〕 However, in January 2015, there were 461 MW of solar power contracted to be built in Idaho which would give the state more solar capacity per capita than any other state.〔(Solar Power Gains Traction in Idaho ), Twin Falls Times-News, January 14, 2015〕 Net metering is limited to 25 kW for residential users, and 100 kW for commercial users, other than for Avista Utilities customers, where the limit for all users is 100 kW. The City of Boise is planning on building a 20 MW solar plant near the Boise Airport, at a cost of $45 million.〔(Boise Solar Plant One Step Closer to Being a Reality )〕〔(Boise to Build $45 Million Solar Power Plant )〕〔(As price of solar power drops, Idaho Power Co. looks to expand its portfolio )〕 A 20 MW solar power plant, Grand View Solar One, in Grand View, Idaho was planned but was not built. Construction of Grand View Solar One was expected to be completed by January 12, 2013.〔(Idaho's first major solar plant takes shape )〕 Grand View Solar Two at 80 MW is expected to be completed by September 2016.〔 ==Statistics==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Solar power in Idaho」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|